[1]
Miti, F. and Dede, G. 2015. Transaction Costs in Constructing Small and Medium Hydro Power Plants in Albania. European Journal of Sustainable Development. 4, 2 (Jun. 2015), 323. DOI:https://doi.org/10.14207/ejsd.2015.v4n2p323.